When it comes to airplane maintenance, two of the most challenging and time-consuming stages are the C-check and D-check — also known as a heavy check or heavy maintenance visit.
While a C-check happens around every 18-24 months and lasts 1-2 weeks, a D-check occurs roughly every 6-12 years and entails removing an airplane from service for weeks or months at a time. Both require thousands of labor hours.
During heavy maintenance:
In short, heavy maintenance is an entire overhaul. But through adequate preparation and parts purchasing using Boeing PART Page, you can ensure a smooth C-check or D-check.
Based on our experience at Boeing, here are our top recommendations for a successful C-check or D-check.
Teams should start by creating a tentative schedule that covers what actions to take and when before commencing heavy maintenance.
Here’s a practical timeline you might follow:
A smooth heavy maintenance visit begins on the Boeing PART Page, where verifying parts availability and making purchases in advance helps eliminate lead-time bottlenecks.
With our e-commerce site, you can:
You can also refer to our list of recommended parts needed for heavy maintenance visits.
Once the C-check or D-check begins, it’s important to keep operators, MROs, and parts teams aligned so nothing falls through the cracks.
Some ways you can do this:
Our final tip is to plan ahead as much as possible. But you should also expect — and budget for — surprises along the way.
To do this effectively:
Aircraft heavy maintenance isn’t simply a project but a strategic program that can significantly impact fleet operations.
To ensure a successful heavy check, operators should plan early and follow a schedule, check for clear alignment between teams, and anticipate common challenges like unexpected expenses and delays.
Additionally, don’t overlook the importance of data. Boeing PART Page makes it easy to track parts availability and lead times, ensuring your heavy maintenance campaign proceeds as smoothly as possible.